McCarran Airport Gates ABC
Airport Engineering Design
Project Summary
McCarran International Airport added 20,555sf of food and retail concession space to the A, B and C gates.
The A gate addition included the design of a new grease interceptor. The C gates includes design of a new elevator and loading docks. All three gates include the design of a new natural gas distribution system.
Architect
KGA Architecture
Awarded
November 2018
Opened
August 2021
Construction Cost
$30M