Hampton Inn Victorville
Mid-rise Engineering Design
Project Summary
(R)evolution Engineering is providing Mechanical, Electrical, and Plumbing Design for a new 5-story, 119-unit Hampton Inn located in Victorville, CA.
The first level includes a lobby, laundry, storage spaces, a boardroom, men’s/women’s restrooms, afood preparation room, a pantry, utility rooms, pool and patio storage rooms, two offices, and some studios.
The second through fifth levels include studios and 9different room types.
Architect
DesignCell Architecture
Awarded
July 2020
Status
Design Phase
Construction Cost
$37M