Grand Desert Behavioral Hospital
Medical Facility Engineering Design
Project Summary
A new 25,000sf, 48-bed behavioral hospital that included nurse’s stations, exam rooms, pharmacy, kitchen and dining, general offices, visitor lobby, and outdoor recreation area.
(R)evolution Engineering provided mechanical, electrical and plumbing design to include emergency electrical system per NEC 517 requirements and other design requirements per the NFPA 99 and NEC 517. Design also included medical gas systems, full HVAC design, and required power, lighting, and site lighting.
Architect
Ed Vance & Associates Architects
Awarded
June 2018
Opening Expected
2022
Construction Cost
$7.5M
Year of Completion